SOLAR ROOFTOP PROJECT AT PC NINH THUAN

DCIM101MEDIADJI_0023.JPG
DCIM101MEDIADJI_0031.JPG
DCIM101MEDIADJI_0045.JPG

All the rooftop positions have been inspected and safely connected to the grid on December 30, 2019. Saigon Gia Dinh Power Corporation has handed over the project to the investor, concluding the supply and installation package for the rooftop solar energy system at the offices of provincial power units and 110kV substations in Ninh Thuan Province – Phase 2.

Project information

Saigon Gia Dinh Electric Joint Stock Company has carried out the supply and installation package for the ‘Rooftop Solar Energy System at the Offices of Provincial Power Units and 110kV Substations in Ninh Thuan Province – Phase 2.’ The project has a total capacity of 93.6 kWp at Ninh Son 110kV Substation, Ninh Phuoc 110kV Substation, and Ninh Hai 110kV Substation.

Progress Completed
Contractor Saigon Gia Dinh Electric Joint Stock Company
Construction Location Ninh Thuan Province