ROOFTOP SOLAR WIND POWER IN DONG THAP

Project information

EHCMC completed the installation of a solar energy rooftop system at Fashion Garments Mekong Limited Liability Company with an installed capacity of 552.69 KWP.

Completion Date 2020
Investor Solar Power Utility Company (SPUC)
Contractor Saigon Gia Dinh Electricity Joint Stock Company
Construction Location 818B National Highway 30, Ap 3, Tam Nong, Dong Thap

Related projects