SAIGON GIA DINH ELECTRIC JSC

  Saigon Gia Dinh Electric JSC is a unit specializing in design consultancy, constructional supervision of transmission lines and substations with voltage up to 500 kV, the General contractor for solar power construction projects, operational organization and maintenance of photovoltaic (PV) plants. Trading in equipment and materials of rooftop solar power.

 

Operator of Fujiwara Binh Dinh solar power plant

 

     Founded in 2011 with more than 20 office workers and electrical engineers, Saigon Gia Dinh Electric JSC now has more than 500 employees working and studying. The workforce with professional attitudes, professional electrical engineers constantly improving their professional skills. EHCMC has a full range of operating certificates such as ISO 9001 – 2015 quality management certification, electrical operating permit, and construction competency certificates.

After many years of experience in the field of electrical grid construction and installation of substations, Saigon Gia Dinh Electric JSC always ensures the construction progress to follow the original commitment, especially always finding the best solutions to provide optimal results for the investors.

 

110 kV substation constructed by EHCMC in Quy Nhon City, Binh Dinh

 

As a mark in 2018, EHCMC became the general contractor for the construction project of Fujiwara solar power plant, in Nhon Hoi Economic Zone, Quy Nhon City, Binh Dinh Province with capacity of 50 MWp. Energized and officially launched into commercial operation on June 26, 2019, successfully connected to the electrical grid, and directly distributed to localities and regions. Moreover, Saigon Gia Dinh Electric JSC also operates and maintains Fujiwara solar power plant in the following years.

 

Saigon Gia Dinh Electric JSC as the General contractor for Fujiwara solar power plant project
 

At the end of 2018, Saigon Gia Dinh Electric JSC continued to be the main contractor for Hong Phong 4 solar power project, in Bac Binh district, Binh Thuan province, with total capacity of 48 MWp, safely energized and launched into commercial operation on May 31, 2019. This is the solar power plant that has the shortest time of completion in Vietnam, within only 280 working days and 3 hours.

 

Saigon Gia Dinh Electric JSC is the main Contractor for Hong Phong 4 solar power plant project 
 

    In recent years, the development of renewable energy is a major trend in Vietnam’s electricity industry. Catching up with popular trend along with its available advantages when building PV plants, Saigon Gia Dinh Electric JSC continues to promote the development of rooftop solar power in factories and some households. Supplying equipment and materials to rooftop solar power installation companies.

 In the future, Saigon Gia Dinh Electric JSC is determined to be the General contractor specializing in the construction of PV plants with  capacity of over 100 MWp across the country and some neighboring countries such as Laos, Cambodia, Myanmar, …, and to be country’s leader in National grid construction.

 