{"id":3397,"date":"2019-07-11T04:11:15","date_gmt":"2019-07-11T04:11:15","guid":{"rendered":"https:\/\/ehcmc.com.vn\/?p=3397"},"modified":"2020-07-14T10:19:10","modified_gmt":"2020-07-14T10:19:10","slug":"main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province","status":"publish","type":"post","link":"https:\/\/ehcmc.com.vn\/en\/main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province\/","title":{"rendered":"Main contractor of Hong Phong 4 Thermal Power Plant project with capacity of 48MWP in Bac Binh District, Binh Thuan Province."},"content":{"rendered":"\n<p><a rel=\"noreferrer noopener\" aria-label=\" (m\u1edf trong tab m\u1edbi)\" href=\"https:\/\/www.youtube.com\/watch?v=iDxlrywErF0&amp;t=32s\" target=\"_blank\">Saigon Gia Dinh Electric JSC\u00a0<\/a>is the main contractor of Hong Phong 4 solar power project in Hong Phong Commune, Bac Binh District, Binh Thuan Province.\u00a0Hong Phong 4 Solar Power Plant project with the total installed capacity of 48 MWp, was invested on an area of \u200b\u200b57.6 ha, in Hong Phong commune, Bac Binh district, Binh Thuan province.\u00a0<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2019\/07\/DJI_0005-2-800x450.jpg\" alt=\"\" class=\"wp-image-1093\" \/><\/figure>\n\n\n\n<p> This is one of the projects that use the modern and advanced technologies of G7 countries such as the single axis &#8211; tracking system of Ideematec (Germany). It is stable and can produce 25% higher power capacity than the fixed mounting system. Annually, the power capacity produced by the system could reach 92 million kWh. <\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2019\/07\/DJI_0046-1-800x450.jpg\" alt=\"\" class=\"wp-image-1094\" \/><figcaption> IDEEMATEC Solar tracking System (Germany) <\/figcaption><\/figure>\n\n\n\n<p>In addition, this is also the project using the panels that have very high-efficiency up to 19.4%, with a capacity of 400w of each from Sunpower (USA), which helps to save land area, and the synchronous equipment of AC Station (Inverter + MV Transformer + RMU) of SMA (Germany) for safe and fast construction and operation as well as stable power quality in operation. The project has 22\/110kV substation (2x25MVA) with synchronous equipment from ABB.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2019\/07\/DJI_0001-800x450.jpg\" alt=\"\" class=\"wp-image-1095\" \/><figcaption> This is the solar power plant with the shortest construction time in Vietnam<\/figcaption><\/figure>\n\n\n\n<p>In addition, this project also uses the advanced SCADA system developed by SunPower and is applied globally with over 5 GW of solar power to support the operation management with high reliability and good performance.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=JZnO7mi8Jpk&amp;t=88s\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\" (m\u1edf trong tab m\u1edbi)\">As the main contractor of Hong Phong 4 solar power project<\/a>, Saigon Gia Dinh Electric JSC has fulfilled the commitment of timely schedule to the investors.\u00a0With only 88 working days, all managers, electrical engineers and workers have been making constant efforts to meet technical requirements in construction, which has contributed to the success of the project.<\/p>\n\n\n\n<p>Thus, Hong Phong 4 solar power plant has been successfully energized, put into commercial operation at 3 p.m. on May 31, 2019, and connected to the national grid.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Saigon Gia Dinh Electric JSC\u00a0is the main contractor of Hong Phong 4 solar power project in Hong Phong Commune, Bac<\/p>\n","protected":false},"author":2,"featured_media":1093,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[117],"tags":[],"class_list":["post-3397","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-events"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Main contractor of Hong Phong 4 Thermal Power Plant project with capacity of 48MWP in Bac Binh District, Binh Thuan Province. - EHCMC<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ehcmc.com.vn\/en\/main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province\/\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Main contractor of Hong Phong 4 Thermal Power Plant project with capacity of 48MWP in Bac Binh District, Binh Thuan Province. - EHCMC\" \/>\n<meta name=\"twitter:description\" content=\"Saigon Gia Dinh Electric JSC\u00a0is the main contractor of Hong Phong 4 solar power project in Hong Phong Commune, Bac\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2019\/07\/DJI_0005-2.jpg\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/ehcmc.com.vn\/en\/main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/ehcmc.com.vn\/en\/main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province\/\"},\"author\":{\"name\":\"\u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh\",\"@id\":\"https:\/\/ehcmc.com.vn\/#\/schema\/person\/ad1210a5f2b3f307d4784ab1c2c055cd\"},\"headline\":\"Main contractor of Hong Phong 4 Thermal Power Plant project with capacity of 48MWP in Bac Binh District, Binh Thuan Province.\",\"datePublished\":\"2019-07-11T04:11:15+00:00\",\"dateModified\":\"2020-07-14T10:19:10+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/ehcmc.com.vn\/en\/main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province\/\"},\"wordCount\":333,\"publisher\":{\"@id\":\"https:\/\/ehcmc.com.vn\/#organization\"},\"articleSection\":[\"News &amp; Events\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/ehcmc.com.vn\/en\/main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province\/\",\"url\":\"https:\/\/ehcmc.com.vn\/en\/main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province\/\",\"name\":\"Main contractor of Hong Phong 4 Thermal Power Plant project with capacity of 48MWP in Bac Binh District, Binh Thuan Province. - EHCMC\",\"isPartOf\":{\"@id\":\"https:\/\/ehcmc.com.vn\/#website\"},\"datePublished\":\"2019-07-11T04:11:15+00:00\",\"dateModified\":\"2020-07-14T10:19:10+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/ehcmc.com.vn\/en\/main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/ehcmc.com.vn\/en\/main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/ehcmc.com.vn\/en\/main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Trang ch\u1ee7\",\"item\":\"https:\/\/ehcmc.com.vn\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Main contractor of Hong Phong 4 Thermal Power Plant project with capacity of 48MWP in Bac Binh District, Binh Thuan Province.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/ehcmc.com.vn\/#website\",\"url\":\"https:\/\/ehcmc.com.vn\/\",\"name\":\"EHCMC\",\"description\":\"C\u00f4ng ty C\u1ed5 Ph\u1ea7n \u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh\",\"publisher\":{\"@id\":\"https:\/\/ehcmc.com.vn\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/ehcmc.com.vn\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/ehcmc.com.vn\/#organization\",\"name\":\"C\u00f4ng ty C\u1ed5 ph\u1ea7n \u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh\",\"url\":\"https:\/\/ehcmc.com.vn\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ehcmc.com.vn\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2023\/12\/logo-khong-vien-khong-bong-khong-nen-02.png\",\"contentUrl\":\"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2023\/12\/logo-khong-vien-khong-bong-khong-nen-02.png\",\"width\":1182,\"height\":1182,\"caption\":\"C\u00f4ng ty C\u1ed5 ph\u1ea7n \u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh\"},\"image\":{\"@id\":\"https:\/\/ehcmc.com.vn\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ehcmc.com.vn\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/ehcmc.com.vn\/#\/schema\/person\/ad1210a5f2b3f307d4784ab1c2c055cd\",\"name\":\"\u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ehcmc.com.vn\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9f53ad4b25071b0e7b63cf0cc6bed3b12d0f7cd546818a202f3d4519843c489a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9f53ad4b25071b0e7b63cf0cc6bed3b12d0f7cd546818a202f3d4519843c489a?s=96&d=mm&r=g\",\"caption\":\"\u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh\"},\"sameAs\":[\"https:\/\/ehcmc.com.vn\"],\"url\":\"https:\/\/ehcmc.com.vn\/en\/author\/diensaigongiadinh\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Main contractor of Hong Phong 4 Thermal Power Plant project with capacity of 48MWP in Bac Binh District, Binh Thuan Province. - EHCMC","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ehcmc.com.vn\/en\/main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province\/","twitter_card":"summary_large_image","twitter_title":"Main contractor of Hong Phong 4 Thermal Power Plant project with capacity of 48MWP in Bac Binh District, Binh Thuan Province. - EHCMC","twitter_description":"Saigon Gia Dinh Electric JSC\u00a0is the main contractor of Hong Phong 4 solar power project in Hong Phong Commune, Bac","twitter_image":"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2019\/07\/DJI_0005-2.jpg","twitter_misc":{"Written by":"\u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ehcmc.com.vn\/en\/main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province\/#article","isPartOf":{"@id":"https:\/\/ehcmc.com.vn\/en\/main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province\/"},"author":{"name":"\u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh","@id":"https:\/\/ehcmc.com.vn\/#\/schema\/person\/ad1210a5f2b3f307d4784ab1c2c055cd"},"headline":"Main contractor of Hong Phong 4 Thermal Power Plant project with capacity of 48MWP in Bac Binh District, Binh Thuan Province.","datePublished":"2019-07-11T04:11:15+00:00","dateModified":"2020-07-14T10:19:10+00:00","mainEntityOfPage":{"@id":"https:\/\/ehcmc.com.vn\/en\/main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province\/"},"wordCount":333,"publisher":{"@id":"https:\/\/ehcmc.com.vn\/#organization"},"articleSection":["News &amp; Events"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/ehcmc.com.vn\/en\/main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province\/","url":"https:\/\/ehcmc.com.vn\/en\/main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province\/","name":"Main contractor of Hong Phong 4 Thermal Power Plant project with capacity of 48MWP in Bac Binh District, Binh Thuan Province. - EHCMC","isPartOf":{"@id":"https:\/\/ehcmc.com.vn\/#website"},"datePublished":"2019-07-11T04:11:15+00:00","dateModified":"2020-07-14T10:19:10+00:00","breadcrumb":{"@id":"https:\/\/ehcmc.com.vn\/en\/main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ehcmc.com.vn\/en\/main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/ehcmc.com.vn\/en\/main-contractor-of-hong-phong-4-thermal-power-plant-project-with-capacity-of-48mwp-in-bac-binh-district-binh-thuan-province\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Trang ch\u1ee7","item":"https:\/\/ehcmc.com.vn\/en\/"},{"@type":"ListItem","position":2,"name":"Main contractor of Hong Phong 4 Thermal Power Plant project with capacity of 48MWP in Bac Binh District, Binh Thuan Province."}]},{"@type":"WebSite","@id":"https:\/\/ehcmc.com.vn\/#website","url":"https:\/\/ehcmc.com.vn\/","name":"EHCMC","description":"C\u00f4ng ty C\u1ed5 Ph\u1ea7n \u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh","publisher":{"@id":"https:\/\/ehcmc.com.vn\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ehcmc.com.vn\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ehcmc.com.vn\/#organization","name":"C\u00f4ng ty C\u1ed5 ph\u1ea7n \u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh","url":"https:\/\/ehcmc.com.vn\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ehcmc.com.vn\/#\/schema\/logo\/image\/","url":"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2023\/12\/logo-khong-vien-khong-bong-khong-nen-02.png","contentUrl":"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2023\/12\/logo-khong-vien-khong-bong-khong-nen-02.png","width":1182,"height":1182,"caption":"C\u00f4ng ty C\u1ed5 ph\u1ea7n \u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh"},"image":{"@id":"https:\/\/ehcmc.com.vn\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ehcmc.com.vn"]},{"@type":"Person","@id":"https:\/\/ehcmc.com.vn\/#\/schema\/person\/ad1210a5f2b3f307d4784ab1c2c055cd","name":"\u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ehcmc.com.vn\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9f53ad4b25071b0e7b63cf0cc6bed3b12d0f7cd546818a202f3d4519843c489a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9f53ad4b25071b0e7b63cf0cc6bed3b12d0f7cd546818a202f3d4519843c489a?s=96&d=mm&r=g","caption":"\u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh"},"sameAs":["https:\/\/ehcmc.com.vn"],"url":"https:\/\/ehcmc.com.vn\/en\/author\/diensaigongiadinh\/"}]}},"_links":{"self":[{"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/posts\/3397","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/comments?post=3397"}],"version-history":[{"count":0,"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/posts\/3397\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/media\/1093"}],"wp:attachment":[{"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/media?parent=3397"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/categories?post=3397"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/tags?post=3397"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}