{"id":3350,"date":"2019-08-12T03:17:58","date_gmt":"2019-08-12T03:17:58","guid":{"rendered":"https:\/\/ehcmc.com.vn\/?p=3350"},"modified":"2020-07-08T10:54:51","modified_gmt":"2020-07-08T10:54:51","slug":"exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany","status":"publish","type":"post","link":"https:\/\/ehcmc.com.vn\/en\/exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany\/","title":{"rendered":"Exchange of experiences in renewable energy (RE) development cooperation with Germany"},"content":{"rendered":"\n<p>Exchange of experiences in RE development cooperation at the Federal Republic of Germany.\u00a0According to Mr. V\u00f5 Quang L\u00e2m, EVN Deputy Director, until June 30, 2019, Vietnam&#8217;s electricity system has got nearly\u00a04,700 MW of solar power capacity.\u00a0It is expected that by December 31, 2019, in approximation, there will be an additional amount of 1,000 MW from this power source\u00a0connected to the National electricity system.\u00a0Thus, the scale of solar power source would be equivalent to about 10% of the total installed capacity of the entire electricity system.\u00a0\u00a0\u00a0\u00a0<\/p>\n\n\n\n<p>The rapid development of RE resources in\u00a0a very short time has been having a remarkable impact on the management and operation of EVN&#8217;s system.\u00a0&#8220;EVN is actively researching and exchanging experiences in development cooperation and operations management of electricity systems of countries,\u00a0among which, Germany is the leader in RE development&#8221;, said Mr. V\u00f5 Quang L\u00e2m.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2019\/08\/f1c8084424e7c0b999f6-800x600.jpg\" alt=\"Trao \u0111\u1ed5i kinh nghi\u1ec7m h\u1ee3p t\u00e1c ph\u00e1t tri\u1ec3n n\u0103ng l\u01b0\u1ee3ng t\u00e1i t\u1ea1o \u0110\u1ee9c\" class=\"wp-image-1230\" \/><figcaption>COB Nguy\u1ec5n \u0110\u1ee9c To\u00e0n (on the right) with the electrical engineers visiting solar power plant in Germany <\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Saigon Gia Dinh Electric JSC had a visit and exchange of development cooperation in RE, especially in solar power with IDEEMATEC &#8211; the developer of installation and monitoring system for solar power installation on megawatt scale worldwide.<\/h2>\n\n\n\n<p>Saigon\nGia Dinh Electric JSC had a visit and exchange of development cooperation in RE,\nespecially in &nbsp;solar power with IDEEMATEC\n&#8211; the developer of installation and monitoring system for solar power\ninstallation on megawatt scale worldwide.<\/p>\n\n\n\n<p>With a track record of more than 2 GW and 12-year-experience in development and 50 patents, IDEEMATEC today offers the leading Solar Monitoring Technology on the market.\u00a0The construction project of <a href=\"https:\/\/www.youtube.com\/watch?v=JZnO7mi8Jpk&amp;t=92s\">Hong Phong 4 solar\u00a0power plant<\/a> 48MWP is also the milestone marking the mutual cooperation process.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2019\/08\/3c4e27a50032e06cb923-800x600.jpg\" alt=\"Trao \u0111\u1ed5i kinh nghi\u1ec7m h\u1ee3p t\u00e1c ph\u00e1t tri\u1ec3n n\u0103ng l\u01b0\u1ee3ng t\u00e1i t\u1ea1o \u0110\u1ee9c\" class=\"wp-image-1214\" \/><figcaption>COB Nguy\u1ec5n \u0110\u1ee9c To\u00e0n and Deputy Director L\u00ea Minh Quang were at IDEEMATEC Germany to discuss about the solar system.<\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Vietnam&#8217;s first solar power plant to use the solar tracking system of IDEEMATEC Germany<\/h3>\n\n\n\n<p>It can be said that this is the first PV module to use the Solar trackers, which provide a large amount of electricity for the national grid and for the <a href=\"https:\/\/www.youtube.com\/channel\/UC5XGjYY48A94vawOaXz5UbQ\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"production and daily life.\u00a0 (m\u1edf trong tab m\u1edbi)\">production and daily life.\u00a0<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2019\/07\/DJI_0046-1-800x450.jpg\" alt=\"Trao \u0111\u1ed5i kinh nghi\u1ec7m h\u1ee3p t\u00e1c ph\u00e1t tri\u1ec3n n\u0103ng l\u01b0\u1ee3ng t\u00e1i t\u1ea1o \u0110\u1ee9c\" class=\"wp-image-1094\" \/><figcaption> A corner of Hong Phong 4 Solar Power Plant project <\/figcaption><\/figure>\n\n\n\n<p>With the motto\u00a0<strong>&#8220;<a rel=\"noreferrer noopener\" aria-label=\" (m\u1edf trong tab m\u1edbi)\" href=\"https:\/\/www.facebook.com\/ehcmc.com.vn\/\" target=\"_blank\">quality is mission, success is destination<\/a>&#8221;\u00a0<\/strong>Saigon Gia Dinh Electric JSC has fulfilled its mission to be the main contractor of the project.\u00a0At the same time, EHCMC is ready to exchange experiences in development cooperation to apply them into practical conditions in Vietnam so as to bring optimal results to the investors.\u00a0\u00a0<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2019\/07\/DJI_0005-2-800x450.jpg\" alt=\"Trao \u0111\u1ed5i kinh nghi\u1ec7m h\u1ee3p t\u00e1c ph\u00e1t tri\u1ec3n n\u0103ng l\u01b0\u1ee3ng t\u00e1i t\u1ea1o \u0110\u1ee9c\" class=\"wp-image-1093\" \/><figcaption> Hong Phong 4 Solar Power Plant <\/figcaption><\/figure>\n\n\n\n<p>We are ready to fully meet the requirements of equipment, technology, and human resources when undertaking the part of <a href=\"https:\/\/ehcmc.com.vn\/\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"the EPC contractor for projects in solar power, wind power, electrical construction and relocation of substations accross the country (m\u1edf trong tab m\u1edbi)\">the EPC contractor for projects in solar power, wind power, electrical construction and relocation of substations accross the country<\/a>. Commitment to ensure projects on schedule with the investors.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2019\/07\/0467539e0e16eb48b207-800x521.jpg\" alt=\"Trao \u0111\u1ed5i kinh nghi\u1ec7m h\u1ee3p t\u00e1c ph\u00e1t tri\u1ec3n n\u0103ng l\u01b0\u1ee3ng t\u00e1i t\u1ea1o \u0110\u1ee9c\" class=\"wp-image-950\" \/><figcaption>Electrical Engineers and Workers at Hong Phong 4 Construction Site <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2019\/08\/0f36ccb30da5eefbb7b4-800x533.jpg\" alt=\"Trao \u0111\u1ed5i kinh nghi\u1ec7m h\u1ee3p t\u00e1c ph\u00e1t tri\u1ec3n n\u0103ng l\u01b0\u1ee3ng t\u00e1i t\u1ea1o \u0110\u1ee9c\" class=\"wp-image-1211\" \/><figcaption>Electrical engineers and Workers at Fujiwara construction site<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2019\/08\/53b60ecc38d1db8f82c0-800x533.jpg\" alt=\"Trao \u0111\u1ed5i kinh nghi\u1ec7m h\u1ee3p t\u00e1c ph\u00e1t tri\u1ec3n n\u0103ng l\u01b0\u1ee3ng t\u00e1i t\u1ea1o \u0110\u1ee9c\" class=\"wp-image-1217\" \/><figcaption> Construction Machinery Team at Fujiwara construction site <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2019\/08\/95dd9ede5cccbf92e6dd-800x533.jpg\" alt=\"\u0110\u1ed9i l\u1eafp gi\u00e1 \u0111\u1ee1 c\u00f4ng tr\u01b0\u1eddng Fujiwara\" class=\"wp-image-1219\" \/><figcaption>Structure team at Fujiwara construction site<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2019\/08\/bbcbf76d327fd121886e-800x533.jpg\" alt=\"\u0110\u1ed9i \u00e1p m\u00e1i C\u00f4ng tr\u01b0\u1eddng Fujiwara\" class=\"wp-image-1222\" \/><figcaption> Rooftop team at Fujiwara construction site <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2019\/07\/74dad77141eaa4b4fdfb-800x593.jpg\" alt=\"\nNh\u00e0 m\u00e1y \u0111i\u1ec7n Fujiwara\" class=\"wp-image-948\" \/><figcaption> Fujiwara power plant<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Exchange of experiences in RE development cooperation at the Federal Republic of Germany.\u00a0According to Mr. V\u00f5 Quang L\u00e2m, EVN Deputy<\/p>\n","protected":false},"author":2,"featured_media":1214,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[117],"tags":[],"class_list":["post-3350","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-events"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Exchange of experiences in renewable energy (RE) development cooperation with Germany - EHCMC<\/title>\n<meta name=\"description\" content=\"Trao \u0111\u1ed5i kinh nghi\u1ec7m h\u1ee3p t\u00e1c ph\u00e1t tri\u1ec3n n\u0103ng l\u01b0\u1ee3ng t\u00e1i t\u1ea1o \u0110\u1ee9c \u0111\u1ec3 \u00e1p d\u1ee5ng v\u00e0o v\u1eadn h\u00e0nh v\u00e0 qu\u1ea3n l\u00fd h\u1ec7 th\u1ed1ng \u0111i\u1ec7n c\u1ee7a c\u00e1c qu\u1ed1c gia.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ehcmc.com.vn\/en\/exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany\/\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Exchange of experiences in renewable energy (RE) development cooperation with Germany - EHCMC\" \/>\n<meta name=\"twitter:description\" content=\"Trao \u0111\u1ed5i kinh nghi\u1ec7m h\u1ee3p t\u00e1c ph\u00e1t tri\u1ec3n n\u0103ng l\u01b0\u1ee3ng t\u00e1i t\u1ea1o \u0110\u1ee9c \u0111\u1ec3 \u00e1p d\u1ee5ng v\u00e0o v\u1eadn h\u00e0nh v\u00e0 qu\u1ea3n l\u00fd h\u1ec7 th\u1ed1ng \u0111i\u1ec7n c\u1ee7a c\u00e1c qu\u1ed1c gia.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2019\/08\/3c4e27a50032e06cb923.jpg\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/ehcmc.com.vn\/en\/exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/ehcmc.com.vn\/en\/exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany\/\"},\"author\":{\"name\":\"\u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh\",\"@id\":\"https:\/\/ehcmc.com.vn\/#\/schema\/person\/ad1210a5f2b3f307d4784ab1c2c055cd\"},\"headline\":\"Exchange of experiences in renewable energy (RE) development cooperation with Germany\",\"datePublished\":\"2019-08-12T03:17:58+00:00\",\"dateModified\":\"2020-07-08T10:54:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/ehcmc.com.vn\/en\/exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany\/\"},\"wordCount\":517,\"publisher\":{\"@id\":\"https:\/\/ehcmc.com.vn\/#organization\"},\"articleSection\":[\"News &amp; Events\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/ehcmc.com.vn\/en\/exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany\/\",\"url\":\"https:\/\/ehcmc.com.vn\/en\/exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany\/\",\"name\":\"Exchange of experiences in renewable energy (RE) development cooperation with Germany - EHCMC\",\"isPartOf\":{\"@id\":\"https:\/\/ehcmc.com.vn\/#website\"},\"datePublished\":\"2019-08-12T03:17:58+00:00\",\"dateModified\":\"2020-07-08T10:54:51+00:00\",\"description\":\"Trao \u0111\u1ed5i kinh nghi\u1ec7m h\u1ee3p t\u00e1c ph\u00e1t tri\u1ec3n n\u0103ng l\u01b0\u1ee3ng t\u00e1i t\u1ea1o \u0110\u1ee9c \u0111\u1ec3 \u00e1p d\u1ee5ng v\u00e0o v\u1eadn h\u00e0nh v\u00e0 qu\u1ea3n l\u00fd h\u1ec7 th\u1ed1ng \u0111i\u1ec7n c\u1ee7a c\u00e1c qu\u1ed1c gia.\",\"breadcrumb\":{\"@id\":\"https:\/\/ehcmc.com.vn\/en\/exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/ehcmc.com.vn\/en\/exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/ehcmc.com.vn\/en\/exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Trang ch\u1ee7\",\"item\":\"https:\/\/ehcmc.com.vn\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Exchange of experiences in renewable energy (RE) development cooperation with Germany\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/ehcmc.com.vn\/#website\",\"url\":\"https:\/\/ehcmc.com.vn\/\",\"name\":\"EHCMC\",\"description\":\"C\u00f4ng ty C\u1ed5 Ph\u1ea7n \u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh\",\"publisher\":{\"@id\":\"https:\/\/ehcmc.com.vn\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/ehcmc.com.vn\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/ehcmc.com.vn\/#organization\",\"name\":\"C\u00f4ng ty C\u1ed5 ph\u1ea7n \u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh\",\"url\":\"https:\/\/ehcmc.com.vn\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ehcmc.com.vn\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2023\/12\/logo-khong-vien-khong-bong-khong-nen-02.png\",\"contentUrl\":\"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2023\/12\/logo-khong-vien-khong-bong-khong-nen-02.png\",\"width\":1182,\"height\":1182,\"caption\":\"C\u00f4ng ty C\u1ed5 ph\u1ea7n \u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh\"},\"image\":{\"@id\":\"https:\/\/ehcmc.com.vn\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ehcmc.com.vn\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/ehcmc.com.vn\/#\/schema\/person\/ad1210a5f2b3f307d4784ab1c2c055cd\",\"name\":\"\u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ehcmc.com.vn\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9f53ad4b25071b0e7b63cf0cc6bed3b12d0f7cd546818a202f3d4519843c489a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9f53ad4b25071b0e7b63cf0cc6bed3b12d0f7cd546818a202f3d4519843c489a?s=96&d=mm&r=g\",\"caption\":\"\u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh\"},\"sameAs\":[\"https:\/\/ehcmc.com.vn\"],\"url\":\"https:\/\/ehcmc.com.vn\/en\/author\/diensaigongiadinh\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Exchange of experiences in renewable energy (RE) development cooperation with Germany - EHCMC","description":"Trao \u0111\u1ed5i kinh nghi\u1ec7m h\u1ee3p t\u00e1c ph\u00e1t tri\u1ec3n n\u0103ng l\u01b0\u1ee3ng t\u00e1i t\u1ea1o \u0110\u1ee9c \u0111\u1ec3 \u00e1p d\u1ee5ng v\u00e0o v\u1eadn h\u00e0nh v\u00e0 qu\u1ea3n l\u00fd h\u1ec7 th\u1ed1ng \u0111i\u1ec7n c\u1ee7a c\u00e1c qu\u1ed1c gia.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ehcmc.com.vn\/en\/exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany\/","twitter_card":"summary_large_image","twitter_title":"Exchange of experiences in renewable energy (RE) development cooperation with Germany - EHCMC","twitter_description":"Trao \u0111\u1ed5i kinh nghi\u1ec7m h\u1ee3p t\u00e1c ph\u00e1t tri\u1ec3n n\u0103ng l\u01b0\u1ee3ng t\u00e1i t\u1ea1o \u0110\u1ee9c \u0111\u1ec3 \u00e1p d\u1ee5ng v\u00e0o v\u1eadn h\u00e0nh v\u00e0 qu\u1ea3n l\u00fd h\u1ec7 th\u1ed1ng \u0111i\u1ec7n c\u1ee7a c\u00e1c qu\u1ed1c gia.","twitter_image":"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2019\/08\/3c4e27a50032e06cb923.jpg","twitter_misc":{"Written by":"\u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ehcmc.com.vn\/en\/exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany\/#article","isPartOf":{"@id":"https:\/\/ehcmc.com.vn\/en\/exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany\/"},"author":{"name":"\u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh","@id":"https:\/\/ehcmc.com.vn\/#\/schema\/person\/ad1210a5f2b3f307d4784ab1c2c055cd"},"headline":"Exchange of experiences in renewable energy (RE) development cooperation with Germany","datePublished":"2019-08-12T03:17:58+00:00","dateModified":"2020-07-08T10:54:51+00:00","mainEntityOfPage":{"@id":"https:\/\/ehcmc.com.vn\/en\/exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany\/"},"wordCount":517,"publisher":{"@id":"https:\/\/ehcmc.com.vn\/#organization"},"articleSection":["News &amp; Events"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/ehcmc.com.vn\/en\/exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany\/","url":"https:\/\/ehcmc.com.vn\/en\/exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany\/","name":"Exchange of experiences in renewable energy (RE) development cooperation with Germany - EHCMC","isPartOf":{"@id":"https:\/\/ehcmc.com.vn\/#website"},"datePublished":"2019-08-12T03:17:58+00:00","dateModified":"2020-07-08T10:54:51+00:00","description":"Trao \u0111\u1ed5i kinh nghi\u1ec7m h\u1ee3p t\u00e1c ph\u00e1t tri\u1ec3n n\u0103ng l\u01b0\u1ee3ng t\u00e1i t\u1ea1o \u0110\u1ee9c \u0111\u1ec3 \u00e1p d\u1ee5ng v\u00e0o v\u1eadn h\u00e0nh v\u00e0 qu\u1ea3n l\u00fd h\u1ec7 th\u1ed1ng \u0111i\u1ec7n c\u1ee7a c\u00e1c qu\u1ed1c gia.","breadcrumb":{"@id":"https:\/\/ehcmc.com.vn\/en\/exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ehcmc.com.vn\/en\/exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/ehcmc.com.vn\/en\/exchange-of-experiences-in-renewable-energy-re-development-cooperation-with-germany\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Trang ch\u1ee7","item":"https:\/\/ehcmc.com.vn\/en\/"},{"@type":"ListItem","position":2,"name":"Exchange of experiences in renewable energy (RE) development cooperation with Germany"}]},{"@type":"WebSite","@id":"https:\/\/ehcmc.com.vn\/#website","url":"https:\/\/ehcmc.com.vn\/","name":"EHCMC","description":"C\u00f4ng ty C\u1ed5 Ph\u1ea7n \u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh","publisher":{"@id":"https:\/\/ehcmc.com.vn\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ehcmc.com.vn\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ehcmc.com.vn\/#organization","name":"C\u00f4ng ty C\u1ed5 ph\u1ea7n \u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh","url":"https:\/\/ehcmc.com.vn\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ehcmc.com.vn\/#\/schema\/logo\/image\/","url":"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2023\/12\/logo-khong-vien-khong-bong-khong-nen-02.png","contentUrl":"https:\/\/ehcmc.com.vn\/wp-content\/uploads\/2023\/12\/logo-khong-vien-khong-bong-khong-nen-02.png","width":1182,"height":1182,"caption":"C\u00f4ng ty C\u1ed5 ph\u1ea7n \u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh"},"image":{"@id":"https:\/\/ehcmc.com.vn\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ehcmc.com.vn"]},{"@type":"Person","@id":"https:\/\/ehcmc.com.vn\/#\/schema\/person\/ad1210a5f2b3f307d4784ab1c2c055cd","name":"\u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ehcmc.com.vn\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9f53ad4b25071b0e7b63cf0cc6bed3b12d0f7cd546818a202f3d4519843c489a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9f53ad4b25071b0e7b63cf0cc6bed3b12d0f7cd546818a202f3d4519843c489a?s=96&d=mm&r=g","caption":"\u0110i\u1ec7n S\u00e0i G\u00f2n Gia \u0110\u1ecbnh"},"sameAs":["https:\/\/ehcmc.com.vn"],"url":"https:\/\/ehcmc.com.vn\/en\/author\/diensaigongiadinh\/"}]}},"_links":{"self":[{"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/posts\/3350","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/comments?post=3350"}],"version-history":[{"count":0,"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/posts\/3350\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/media\/1214"}],"wp:attachment":[{"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/media?parent=3350"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/categories?post=3350"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ehcmc.com.vn\/en\/wp-json\/wp\/v2\/tags?post=3350"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}